eden innovations upgrade

Eden Innovations Upgrade

Murphy Company was contracted to complete a complex process installation to bring Eden Innovations from a small R&D operation to a full-scale manufacturing of their concrete additive products. Transformation of this manufacturing facility was broken into two phases: one which was a standard lump sum contract and the other a design/build renovation.

Phase 1: The scope included the installation of large reactor furnaces and afterburners, process piping, structural steel, electrical, and general construction. In this phase, Murphy Company acted as the prime contractor, which presented unique challenges with the aggressive 4-month schedule.

Phase 2: Phase 2 was a design/build renovation of an existing space in a new research laboratory. Again, Murphy Company led the design team through the development of the project and helped the client turn a conceptual list of needs into an actionable and efficient design. As the mechanical prime, we led a team of general constructors and electrical contractors to successfully complete this project.

Owner Eden Innovations
Building Type Renovation
Project Size $2,000,000
Contract Type Lump Sum
Completion Date 2017
Project Duration 7 Months

Murphy Team

Project Manager: Hayden Rice
Plumbing Foreman: Les Rice
Sheet Metal Foreman: Steven Romero

Project Team

General Contractor: Murphy Company
Engineer: Murphy Company
Architect: Kenny Lee
Electical: Kenny Electric

Scope of Work

HVAC
Piping
Plumbing
Process Piping
Sheet Metal